Uncategorized

E-ONE Facility Tour

01 / 25

E-ONE Fire Apparatus Cab Being Fabricated

02 / 25

A Pump Module Mounted to an E-ONE Chassis

03 / 25

An Engine Mounted to a Chassis at E-ONE

04 / 25

Fire Appratus Cab by E-ONE During the Assembly Process

05 / 25

Top-Mount Pump Module Waiting to be Mounted to an E-ONE Fire Apparatus Chassis

06 / 25

An E-ONE Fire Apparatus with Cab and Body Mounted to a Chassis

07 / 25

E-ONE Pumper with Body and Cab Attached to the Chassis Waiting for Bumper to be Mounted

08 / 25

E-ONE Fire Apparatus on a Quest Chassis

09 / 25

E-ONE Fire Apparatus “On the Line”

10 / 25

E-ONE Fire Apparatus Construction Stage Board in the “Control Center”

11 / 25

E-ONE Extrusions Used During Fire Apparatus Assembly

12 / 25

An E-ONE Custom Cab During the Fabrication Stage

13 / 25

An E-ONE Fire Apparatus Rescue Body During the Fabciation Process

14 / 25

A New E-ONE Steel Ladder Being Assembled

15 / 25

An Aluminun E-ONE Platform at the Test Stage

16 / 25

E-ONE Turntable on the Testing Platform

17 / 25

An ARFF Unit Under Construction at the E-ONE Fire Apparatus Manufacturing Facility

18 / 25

E-ONE Aerial Fire Apparatus Proceeding through a Leak Test

19 / 25

An E-ONE Custom Cab

20 / 25

An E-ONE Fire Apparatus Cab During the Assembly Process

21 / 25

E-ONE-Branded Seats Ready to be Added to a Custom E-ONE Fire Apparatus Chassis

22 / 25

E-ONE Fire Apparatus Cab Being Assembled

23 / 25

A Crew Seat Waiting to be Added to a Cab at the E-ONE Manufacturing Facility

24 / 25

E-ONE Fire Apparatus Chassis Awaiting Cab and Body

25 / 25

E-ONE Fire Apparatus Cab before Beign Attached to a Chassis